Monday, February 10, 2014
The Shop Tour Series Part I
Working down in the trenches during the early days of shop renovation. |
I’m currently in what I call Phase 1 of the the renovation. It is the wiring, insulation and sheathing of the two (2) exterior walls. The remaining phases, as I envision them now, are as follows:
Phase 1.5 Insulate and Sheath the Floor
Phase 2 Bump out the back wall
Phase 3 Cathedral the ceiling
As I’m hoping to accomplish a lot in the shop this year, I thought it would be interesting and motivating to document it on a regular basis. So, I’m going to film a shop tour each month. For this first one (1), I spend a bit of time just going over the shop. In the future I’ll try to focus on what has changed.
Here is the premier: 2013 January Shop Tour
Subscribe to:
Post Comments (Atom)
No comments:
Post a Comment